This library collects technical documents for the Kadier coating systems by group. The coating systems are currently completing their technical dossiers and independent testing before launch day; official documents will be published at launch together with the independent test dossiers. While waiting for publication, the general technical content below can be read directly on this page.
Documents by group
- Technical Data Sheets (TDS) — Status: To be published. No file available for download yet.
- Safety Data Sheets (SDS) — Status: To be published. No file available for download yet.
- Installation guides — Status: To be published. No file available for download yet.
- Process and acceptance — Status: Awaiting publication. The general process framework and acceptance criteria can be read directly below.
When official documents are published, each group will have a document list with publication dates. This page does not publish temporary files or drafts in place of official documents.
General installation process
- Site survey: area, concrete substrate condition, environmental conditions, expected traffic type and the time available for handover of the work area.
- Concrete substrate preparation: floor grinding, crack repair, moisture measurement — a mandatory step before coating.
- Primer application: improves adhesion and seals pores on the substrate surface, at the mixing ratio specified by the manufacturer.
- Topcoat application: intermediate coat and finishing topcoat according to the configuration of the selected system.
- Curing and acceptance: wait until the coating reaches the condition stated in the instructions, then inspect and hand over.
Substrate conditions before installation
- Concrete at least 28 days old, grade above 200.
- Floor moisture content below 6–8%.
- Ambient temperature 10–35°C and air humidity below 75–85% during installation.
General acceptance criteria
- Seamless surface, no peeling, bubbling or exposed substrate voids.
- Coating thickness matching the configuration of the selected system.
- Uniform colour; markings (if any) in the agreed positions.
- For anti-static systems: on-site resistance measurement together with the project owner.
- Handover cleaning and maintenance and cleaning guidance for the floor after installation.
Solutions by industry are available at Epoxy Floor Coating Solutions by Industry. Kadier coating systems: RollCoat, LevelFlow, StatGuard, AquaBase.
Contact us for a quote — pricing follows a quotation after an on-site survey of the actual premises.