The industrial park cluster around Di An, Thuan An and Thu Dau Mot sets a demand few other clusters set to the same degree: a floor must not only be durable, it must also pass an FDI-style acceptance inspection. Foreign investors, EHS managers and quality managers often check a floor against their own checklist: thickness […]
Category Archives: Uncategorized
Dong Nai is a rare cluster in which four sub-areas within one cluster set four almost entirely different floor problems: electronics and precision engineering in Bien Hoa, heavy industry and chemicals in Nhon Trach, high technology and air-cargo logistics in Long Thanh, and traditional textiles and footwear along National Highway 1A. The right question for […]
The industrial park cluster around Duc Hoa and Can Giuoc is the western gateway to Ho Chi Minh City: more generous land than the urban core, many new plants and warehouses, and a broad industry range from supporting industries to pharmaceuticals and seafood processing. But the very advantage of “many new plants” comes with a […]
The Phu My and Cai Mep cluster is where the three greatest pressures on an industrial floor appear at the same time: extremely heavy loads, chemicals and a marine environment. Trucks and containers running over a port warehouse floor are unlike forklifts in an ordinary warehouse; chemicals, oils and fuels at heavy plants are unlike […]
Factories in Ho Chi Minh City and the surrounding area rarely need a completely new floor on empty land. The more common problem is a plant that has been running for years, on an old concrete slab that is cracked, oil-stained and peeling in patches, while production still has to keep running and the owner […]
For a project of around 10,000 m², an epoxy floor budget is no longer a table of materials plus labour; it is a project management plan: substrate zoning surveys, batch-controlled material supply, phased application and acceptance, and batch-based quality documentation. This article is a project-level budget framework for a 10,000 m² factory — the list […]
Two epoxy application quotations for the same factory sometimes differ by exactly one tax amount — not because one side is cheaper, but because one side quotes excluding VAT and the other including VAT, or because the tax rate on the two quotations applies at two different times. This article presents only public tax rules, […]
Final acceptance is the moment the owner signs to confirm the works are complete under the contract — and it is also the moment tied to the final payment instalment. This article covers that pair: what to accept, what the acceptance record must contain, how outstanding items are handled, and only then full payment. Its […]
The purchasing, QA and EHS departments of an FDI plant, when accepting epoxy coating materials, usually do not only ask “is the coating good?” but “where are the documents?” This article presents the set of documents commonly required for FDI projects, how the document types differ from each other, and the reconciliation process when receiving […]
An epoxy coating quotation for a renovation project differs from one for a new floor on one fundamental point: for a new floor, the contractor knows what it will be coating; for an old floor, nobody knows the full truth of the substrate until the old coating is stripped off. This article covers renovation quotations […]










